The Project.

We were asked by the contractor to provide a cost effective solution to a client’s office washrooms. With the refurbishments taking place within a live office we had to come up with a plan to limit disruption.

The Solution.

We supplied and fitted a variation to our Force cubicles in HPL, laminate duct panels and laminate vanity units across five floors at the Gredley House office building in London, providing a sleek, modern suite complete with partitions, pilasters, vanity tops and shadow gaps. Working with the contractor we extended our working hours to keep disruption to a minimum.

The CCS project management team were faultless and were always ahead of the game with design drawings and Health and Safety Risk and Method Statements in advance of each phase of the project. Deliveries were always punctual and were meticulously managed by the CCS Project manager and installation team.

The installation team were well equipped and were very experienced. Their flexibility and ability to solve onsite day-to-day installation issues was exceptional.

I will happily continue using Concept Cubicle Systems as they are competitive, very professional and their lead times are very realistic.”

Robert Pratt

Senior Site Manager

Noble House Services

Colours Used

  • Formica F7912 Storm
  • Formica F7923 Surf