Flush-fronted washroom refurbishment at 1 New York Street, Manchester

The Project  

 

1 New York Street is a contemporary workspace in the heart of Manchester, offering a dynamic and professional environment for businesses. With a prime city centre location and an abundance of amenities, this development is a trend setter for modern workspaces. As part of a wider range of improvement works, Concept was commissioned by Blok Projects to supply and install cubicle systems across four floors, ensuring the facilities met the same high standards as the rest of the building.

With 1 New York Street setting a benchmark for premium office space, the washrooms needed to reflect the same contemporary aesthetic and high-performance expectations. The goal was to seamlessly integrate modern, durable washroom cubicles with the building’s existing interior design, providing a polished and professional finish.

The Solution

 

To achieve the desired high-end look and long-lasting functionality, we supplied our Identity washroom cubicles alongside our laminate Duct Panel System across the four floors.

Our Identity cubicles were chosen for their flush-fronted design which delivers a striking first impression. Made with resilient High-Performance Laminate (HPL), the floor-to-ceiling doors offer unparalleled privacy while continuing the buildings strong architectural presence through into the washroom. Additionally, the closing strip on the door reverse replaces the rebate found in traditional flush cubicles, making Identity a more value engineered alternative.

Complementing the cubicles, the laminate Duct Panel System was installed to maintain a streamlined, clutter-free environment. Expertly crafted to conceal pipework and services, this system keeps everything looking clean and refined while offering outstanding durability.

For the washroom scheme, the Identity cubicles were finished in Polyrey G059 Gris Orage while the Duct Panel’s where supplied in Polyrey N056 Noisetier Naturel. The contrast of the darker slate hues of the cubicles with the natural wood scheme of the Duct Panel System makes for a clean, modern aesthetic that perfectly harmonises with the striking stone tiling that surrounds the wash basins.

The project was completed within a 10-day timeframe, delivering a sophisticated and modern washroom environment that aligns with the overall aesthetic of 1 New York Street. By seamlessly integrating the Identity cubicles with the laminate Duct Panel System, we have provided a solution that not only improves the building’s facilities but also ensures longevity and ease of maintenance. This successful upgrade reinforces the building’s commitment to providing top-tier facilities that match its premium office spaces.

Colours Used

Products Used

Samples in your cart (0)